Posts tagged staff
RBA Welcomes Dustin Locke!

With an interest in architecture since childhood, and after a four year stint in the US Navy, Dustin earned a Bachelor of Art in Architecture with a minor in Photography at the University of Oregon in 2013. While at UO, Dustin received a travel scholarship to participate in the Rome study abroad program and traveled to London, where he led research mapping the evolution of London’s building typologies.

Read More
Staff, RBA OfficeSerena Limstaff
Welcome Serena Lim!

Serena Lim recently joined Rowell Brokaw as a designer after earning her M.Arch at the University of Oregon. She has always loved drawing and crafting and brings strong creative skills to the firm. After earning a B.A. in Liberal/Visual Arts from the Evergreen State College in 2008, she worked as a freelance graphic designer, textile restoration specialist, and co-founded and directed Oxtail Studio & Gallery in Berkeley, CA. She also worked as a junior designer at Goring & Straja Architects before returning to school to earn her master’s degree in architecture.

Read More
Soft Opening of Claim 52 at 1203 Willamette

After finishing the move to our new office, we walked downstairs to Claim 52 Brewing for their soft opening. When Rowell Brokaw was deciding whether to develop and renovate the building, we saw Capstone Apartments, which is situated directly across the street, as this project’s biggest liability. But in the end, we decided to go forward with the project. From an architectural and urban design perspective, Capstone is a sad and sorry example, but it has, on a positive note, brought a large number of residents to this part of downtown. Ultimately, we must move on, repair the damage, renew, and move forward. We think 1203 Willamette is a step in the right direction.

Read More
Rowell Brokaw has moved!

We are excited to announce that we have moved! The Rowell Brokaw office is now at the following address: 1203 Willamette, Suite 220, Eugene, Oregon 97401.

We are still settling into our new space, but we will let you know should we have a formal or informal party. There is an exciting mix of tenants in the building: Claim 52, Katie Brown, Saucefly, deChase Miksis, Q. Sterry Inspired Architecture, and Watkinson Laird Rubenstein, P.C. The ground floor has a series of garage doors that open onto Willamette. The outdoor sidewalk area is intentionally deep to allow for outdoor seating and retail opportunities.

Read More
Blum's Age Explorer Suit

Throughout the year, Rowell Brokaw has Lunch 'n Learns, in which reps come from various building industries to educate the firm on their latest products and services. Recently reps from E.B. Bradley Company of Portland showed us the Blum product line. They also brought along Blum’s Age Explorer Suit, which simulates aging 30+ years. Blum developed this suit to aid in their designs: their engineers experience firsthand what a 70+ year old goes through with something as simple as opening a cabinet. This understanding informs the function, motion and technology in their hardware. Blum has developed a series of motion technologies, lift systems, concealed hinges, runner systems and more.

Read More
Frank Visconti Bringing New York to Eugene

Writing sometime around the year 30 B.C., the Roman architect Marcus Vitruvius Pollio — Vitruvius, to his friends — laid out, in his foundational work De Architectura, three principles that should inform all architecture: firmitasutilitasand venustas.

More than 2,000 years later, Eugene architect Frank Visconti translates those Latin terms as “firmness,” meaning that a building is structurally sound; “commodity,” meaning that it’s functional; and “delight.”

“That’s the joy that one gets out of it,” Visconti says.

Read More
Virtual Reality as a Design Tool

Rowell Brokaw has been using Virtual Reality (VR) to understand their new office space in 1203 Willamette. Project Architect Paul Harman helps explain the benefits of this new medium: “Even though we have robust digital tools and the ability to see things on screen in perspective, we are still limited by our renderings: they are not always convincing and navigation with a mouse can be clumsy..

Read More
Andersen Construction Performs the Impossible

During a planned power outage for the Pacific Hall renovation to replace the rooftop electrical transformer this weekend, the Pacific team encountered a serious problem. When power was transferred to backup Friday evening around 6pm and the old transformer removed, it was discovered that the steel structure under the platform supporting the existing transformer was nothing like the as-builts the design team had been working from. The original plan to modify the existing structure to accommodate the new, 40% heavier transformer no longer made sense.

Read More