South Hills House Construction Sequence

The South Hills House has come a long way since fall of last year. Here is a construction sequence of the terrace. One can see the clear volumes and signature cantilevered roof taking shape, the dramatic slope of the site being reconciled, and the envelope—an Equitone fibre-cement rainscreen system—being developed. Currently, the owners are in the process of moving into their new home.

Read More
Welcome Serena Lim!

Serena Lim recently joined Rowell Brokaw as a designer after earning her M.Arch at the University of Oregon. She has always loved drawing and crafting and brings strong creative skills to the firm. After earning a B.A. in Liberal/Visual Arts from the Evergreen State College in 2008, she worked as a freelance graphic designer, textile restoration specialist, and co-founded and directed Oxtail Studio & Gallery in Berkeley, CA. She also worked as a junior designer at Goring & Straja Architects before returning to school to earn her master’s degree in architecture.

Read More
Mark Young's illustrations and Nicola Fucigna's article on Italo Calvino's Invisible Cities featured in Construction Literary Magazine

Italo Calvino's Invisible Cities has captured the imagination of many architects, including RB’s Mark Young and Nicola Fucigna. When Mark was studying abroad in Copenhagen as an undergrad, he illustrated all 55 cities. A collection of these illustrations are featured in Construction, a quarterly online literary magazine, where Nicola runs an architecture column on the poetics of real and imagined spaces.

Read More
UO Robinson Theater Rigging Project

The UO Robinson Theater Rigging Replacement project has been successfully completed. All of the obsolete, existing equipment was replaced with contemporary stage rigging equipment. This rigging includes rope lines, blocks (pulleys), and counterweights that allow a stage crew to “fly” or hoist objects—such as lights, curtains, and scenery—out of view of the stage. Rowell Brokaw worked with PLA Theatrical Consultants, Systems West Engineers as electrical consultants, the Ausland Group as general contractor, Stagecraft Industries as the rigging subcontractor, and JKG Electric as subcontractors to complete the project.

Read More
Eureka Veterans and Homeless Housing Approval

Today the Eureka Design Review Committee approved plans for development of an apartment complex on the corner of Fourth Street between B and C Streets in Eureka, intended to house veterans and people at risk of homelessness.

“We’re just trying to help the community, help the people on the streets and give them a leg up,” Development company Danco CommunitiesPresident Chris Dart told the Outpost.

Read More
1203 Willamette Open House Celebration

Rowell Brokaw, deChase Miksis, Trifoia, Watkinson Laird Rubenstein Attorneys, & Claim 52 held an open house at 1203 Willamette. The event was catered by Saucefly. The whole building was opened up for visitors to explore all the offices in the newly remodeled building. It was fascinating to see the various ways that each office has developed its workspace in the exposed timber structure.

Read More
"Topping Out" Ceremony for Tykeson Hall

Tykeson Hall’s “topping out” was celebrated this Friday. Willie Tykeson, Dean Marcus, other key donors and UO members, and the construction workers on the building signed the final steel beam that was then, via a crane, lifted into place. The ceremony commemorates the completion of the last major piece of structure for the project. Now the construction team—Fortis Construction and its many subcontractors—with support of the design team will turn to the cladding of the building, followed by installation of the interior finishes. Tykeson is slated to open in Fall 2019.

Read More
Full Steam Ahead: Steam Plant Redevelopment Featured in Register-Guard

“Eugene officials are putting their faith in a group of prominent local developers, architects and business executives to transform the former Eugene Water & Electric Board steam plant.

The city announced Tuesday that it had picked a team led by Mark Miksis of deChase Miksis Development and Arcimoto CEO Mark Frohnmayer to submit a formal proposal for the 87-year-old steam plant’s redevelopment. City officials chose the team over two other groups that expressed interest earlier this year.”

Read More
2018 Summer Intern Julia Chou

This summer Julia Chou joined us for an internship. Julia grew up in Eugene and as part of her senior project in high school she completed her job shadow at Rowell Brokaw’s old office. She is now entering her second year in the architecture department at Syracuse University.

Julia worked on several projects in the office: renderings of 1235 Willamette, a Revit model of the Steam Plant (formerly owned by EWEB), and signage for Rowell Brokaw’s office. She worked closely with John Rowell and Patrick Hannah.

Read More
Tykeson Hall's Crane Featured in the Daily Emerald

“Perched far above the claustrophobic PLC offices, looming over the infamous steps of Johnson Hall, sits a 172 EC-B Liebherr tower crane. Standing at more than 200 feet in the air, the view from the crane’s cab might be one of the best in town. On a clear day, one can see everything from Eugene’s east hills and Hendricks Park to the city’s tallest building, the Ya-Po-Ah Terrace.”

Read More