University of Oregon architecture students had a strong finish to their terminal studio on the Glenwood Riverfront.
Read MoreOverall, Phase 1 construction is going well.
Read MoreSwing by the UO Tykeson Hall west lawn and roof terrace to enjoy daffodils blooming in this cold, sunny weather.
Read More“Since 1975, the Oregon Arts Commission has managed the state’s Percent for Art Program, which stipulates that one percent of the construction budget for a public building shall be set aside for art… The art acquired for Tykeson Hall ranges from nature photographs to oil paintings to a five-story interactive sculpture in the main stairwell—all of which amplify the natural environment thematics and color schemes in the building.”
Read MoreSlated to open 2019 Fall term, Tykeson will soon serve thousands of students and faculty. Each of Tykeson’s floors was designed to evoke a unique Oregon landscape, and is linked to the other floors by a 3-story interactive art installation that hangs in the central stair.
Read MoreIn November 2018, Eugene voters approved Bond Measure 20-279 to fund capital improvements benefiting all of Eugene’s 4J public schools. North Eugene High School is one of three schools with aging facilities that will be completely redesigned and replaced, thanks to the 4J bond measure.
Read MoreUO Campus Housing selected Rowell Brokaw, partnered with Mithun, to design new residence halls that will replace the Hamilton and Walton Complexes on the University of Oregon’s Eugene campus. The two-phase project will include two new residence hall complexes, a visitor’s center, landscaped outdoor spaces, and amenities for students, staff, and visitors.
Read MoreA unique aspect of the University of Oregon campus is, if you dig more than 5 or 6 feet underground, there’s a good chance you will hit rock – specifically the Eugene Formation, a local geologic formation that has preserved fossils dating back to the Paleogene period.
Read More