There is a buzz of activity at Crescent Village East and the Inkwell Building with tenant improvements and upgrades to leasable spaces underway. NorthFork, a new restaurant serving rustic comfort food and craft beer, as well as a veterinarian office are joining the ground-floor mix of retail, restaurants, and offices at Crescent Village.
Read MorePacific Hall is being transformed into a new research hub for the Human Physiology, Geography, and Anthropology departments at the UO. A typical lab has four open bays, each 10’8” by 22’0”, and a fifth, enclosed bay that serves as flex space for a clean room, biopsy room, data analysis area, and/or office. Each entry will be storefront and have a seating bench for socializing in the corridor. Alignment of entry zones across corridors creates sight lines between labs and to the outdoors.
Read MoreThe University of Oregon is preparing to build a major new student advising and career center at the heart of its campus. The $39 million building, named after the late Eugene businessman Don Tykeson and his wife, Willie, who contributed $10 million, also will include six classrooms and house the College of Arts and Sciences administrative offices on its upper floors.
Read MoreDuring a planned power outage for the Pacific Hall renovation to replace the rooftop electrical transformer this weekend, the Pacific team encountered a serious problem. When power was transferred to backup Friday evening around 6pm and the old transformer removed, it was discovered that the steel structure under the platform supporting the existing transformer was nothing like the as-builts the design team had been working from. The original plan to modify the existing structure to accommodate the new, 40% heavier transformer no longer made sense.
Read MoreWillie Tykeson, President Michael Schill, Dean Andrew Marcus, and Kathryn Sternberger ('17) broke ground for Tykeson Hall, a $39 million facility devoted to liberal arts education and career development at the University of Oregon. In this innovative project, academic and career advising will be housed under one roof, allowing undergrads to realize the career possibilities behind their academic choices. As Dean Marcus explains, "We want to help students navigate college intentionally and give them the ability to articulate the specific skills they’ve acquired.
Read MoreThe grand opening of the Eugene 4J Arts & Technology Academy at the Jefferson Middle School featured a ribbon cutting, student performances, and architectural tours of the building. The design of the new building supports ATA’s innovative STEM program, which integrates science, technology, engineering, and math into the curriculum in hands-on, real-world ways. For a more in-depth explanation of the design, see the brochure we created for the event:
Read MoreThe city of Eugene is aiming to complete construction for a park and other riverfront redevelopment by 2021. The future park is part of the city’s Riverfront Urban Renewal District, which includes 16 acres of riverfront property sold by the Eugene Water and Electric Board to the city for $5.75 million in 2016
Read MoreEarly in the design phase of the Roseburg Forest Products (RFP) project, Rowell Brokaw travelled with the RFP design team to the DIRTT headquarters in Calgary, Canada. Since 2003, DIRTT has been creating innovative modular wall systems. During their visit, the design team saw a glass wall full of lemons that DIRTT had created for Mike’s Hard Lemonade.
Read MoreProject architect Frank Visconti and landscape architect Lorri Nelson go over details with Wilbur Burge, project manager for 2G Construction. The South Hills Houseis taking shape: concrete retaining walls and foundation have been poured, the wood formwork will come down soon, and the footprint is starting to be framed.
Read MoreRenovation moving forward at 1203 Willamette, a mixed-use office and retail building. This will be the third substantial remodel since the original building’s construction in 1942 and expansion in 1946. A goal of the current remodel is to expose the structure, including the existing wood columns, wood ceiling joists, and board formed concrete walls. Structural upgrades, such as glulam beams, have been added to the 36,000-square-foot building. The west elevation facing Willamette Street will be storefront, windows, and wood finishes.
Read MoreMark Young, AIA, LEED AP BD+C, principal at Rowell Brokaw, said this project stands apart from other projects the firm has done on the campus because of the unique and innovative program involved. “There isn’t much precedent to rely on, so programming has been very exploratory. There have been significant discoveries about the program that have come about through the design of the building,” he said. “In addition, the central location in the historic campus core brings a higher level of visibility and scrutiny to the project, much more than our previous work at the University of Oregon.”
Read MoreConstruction is moving along at Amazon Corner, a mixed-use apartment building at 32nd Avenue and Hilyard Street in South Eugene. Construction has come a long way since the formwork and concrete placement in the basement level in late June. Enjoy these drone pics and close-ups, courtesy of Essex General Construction.
Read MoreA new play area in Zelienople may look like a regular playground, but for the kids at Glade Run Lutheran Services it is so much more. The playground, which is scheduled to have its public grand opening on Tuesday, is one of less than a dozen playgrounds in the country designed specifically with autistic children in mind.
Read MoreA group of Eugene developers plans to add life to a downtown building they say now contributes to a dead zone in the heart of the city. Mark Miksis, John Rowell, Greg Brokaw, Kaz Oveissi and other investors intend to buy the vacant building on Willamette Street that formerly housed the Oregon Antique Mall and renovate it for use by several businesses, including a couple of their own.
Read MoreResidents have worked since 2009 to create a new library for this small town, and their efforts are finally paying off. A groundbreaking for the new Jefferson Public Library, which will be adjacent to City Hall, is scheduled for 5:30 p.m. March 23. “I’m giddy,” said Linda Baker, president of the Friends of the Jefferson Library. “This group has worked a long time.”
Read MoreParents get a chance to leave notes to their kids on the walls of newly renovated Columbia Hall 150, the second largest lecture hall at the University of Oregon. Rowell Brokaw completed the remodel in time for the start of school, Fall of 2016.
Read MoreConstruction is moving at a brisk pace at Roseburg Forest Product's new headquarters building in Springfield, Oregon. Exterior painting and interior installations are currently underway. Construction will be complete in August 2016. McKenzie Commercial Contractors is the general contractor.
Read MoreMcKenzie Commercial Contractors held an open house on the Eugene City Hall site to talk to subcontractors and maximize the number of bids McKenzie will received. The bids submitted to the contractor will shape the City Hall budget proposal that is to come before the City Council for its review and vote this summer. Download PDF presented at Tuesday's open house.
Read More